Main contracting
Full scope delivery on high-rise and mid-rise builds, from enabling works to snag-free handover under a single contract.
- Substructure and piling
- Structure and envelope
- Testing and commissioning
Dubai · Abu Dhabi · Riyadh · since 1998
A UAE main contractor for towers, hospitals, warehouses and fit-out. Fixed price, one programme, and a site team that answers the phone.
What we take on
Most of what goes wrong on a build happens at the seam between two contractors. We hold the seams ourselves.
Full scope delivery on high-rise and mid-rise builds, from enabling works to snag-free handover under a single contract.
One accountable team for design and construction, with a fixed lump sum agreed before mobilisation.
Hotel keys, clinics, offices and F&B units finished to brand standard while the rest of the building stays open.
In-house mechanical, electrical and plumbing teams, so services are coordinated in the model rather than on site.
Roads, utility corridors, deep drainage and hardscape packages for masterplans and industrial estates.
Bathroom pods, facade cassettes and plant rooms built in a controlled factory and lifted in complete.
Sectors we know
Slab cycles held at six days, a facade train that follows the structure up, and a snagging team that starts before topping out.
Selected projects
Six of the last 340. Every one delivered under a main contract with our own supervision on site.
Business Bay, Dubai
48-floor residential tower, 512 apartments, three basement levels.
Jebel Ali Free Zone
96,000 m² temperature-controlled distribution centre and gatehouse.
Al Barsha, Dubai
220-bed hospital, eight theatres, imaging block and helipad.
Al Qudra, Dubai
180-key desert resort, 14 villas, spa and beach club fit-out.
Dubai Hills
Two-level retail pavilion, 62 tenant units, structural glass roof.
Dubai Investments Park
Interchange upgrade and 3.4 km of utility diversions, RTA standard.
Case study · Business Bay, Dubai
Handed over five weeks early on a site with four metres of ground water and one access road shared with two live towers.
“They ran the interface with the two neighbouring towers themselves. We never once had to arbitrate access.”
How we build
You will know which stage the job is in, who owns it, and what is due next — every week, without asking.
A priced bill, a buildability review and every risk we can see from day one, written down before anyone signs.
Structure, MEP and facade clash-detected to LOD 350, so the model is the drawing set the site actually builds from.
Municipality, Trakhees, DDA, Civil Defence and DEWA submissions tracked on one register with named owners.
Site establishment, tower cranes, hoardings and an induction every worker passes before they reach the deck.
A weekly look-ahead, a fortnightly client walk, and a cost report that arrives on the same date every month.
Commissioning evidence, O&M manuals and as-builts on day one, then a defects team you can call directly.
Health, safety and welfare
Certified to
Audit reports and method statements are available on request during tender, not after award.
Clients and consultants
“Twenty-two months, four variations, and not one claim at the end of it. That is rare in this market.”
Project Director · Northline Industrial
Request a quote
Concept sketches are enough to start. If you have a tender pack, even better — attach it in the reply to our acknowledgement.