Site engineers walking a poured slab before the next lift

Dubai · Abu Dhabi · Riyadh · since 1998

We build it once, and we build it right.

A UAE main contractor for towers, hospitals, warehouses and fit-out. Fixed price, one programme, and a site team that answers the phone.

27
years in the Emirates
AED 9.4b
delivered contract value
0.28
LTIFR, 12-month rolling
27
Years building in Dubai and Abu Dhabi
340+
Projects handed over since 1998
2.4m m²
Built-up area completed
98%
Handed over on or before the contract date

What we take on

Six scopes, one contract, no gaps to argue about.

Most of what goes wrong on a build happens at the seam between two contractors. We hold the seams ourselves.

01

Main contracting

Full scope delivery on high-rise and mid-rise builds, from enabling works to snag-free handover under a single contract.

  • Substructure and piling
  • Structure and envelope
  • Testing and commissioning
02

Design and build

One accountable team for design and construction, with a fixed lump sum agreed before mobilisation.

  • Concept to IFC drawings
  • Authority approvals
  • Guaranteed maximum price
03

Fit-out and interiors

Hotel keys, clinics, offices and F&B units finished to brand standard while the rest of the building stays open.

  • Joinery from our Al Quoz workshop
  • Out-of-hours programmes
  • Brand-standard sign-off
04

MEP engineering

In-house mechanical, electrical and plumbing teams, so services are coordinated in the model rather than on site.

  • DEWA and Etihad Water connections
  • District cooling interfaces
  • BMS integration
05

Civil and infrastructure

Roads, utility corridors, deep drainage and hardscape packages for masterplans and industrial estates.

  • Earthworks and dewatering
  • Wet and dry utilities
  • RTA-standard road works
06

Offsite and modular

Bathroom pods, facade cassettes and plant rooms built in a controlled factory and lifted in complete.

  • Pod assembly line
  • 40% shorter wet trades
  • Lower on-site headcount

Sectors we know

Different buildings. Different rules.

High-rise residential

Towers that hand over floor by floor.

Slab cycles held at six days, a facade train that follows the structure up, and a snagging team that starts before topping out.

52 floors
Tallest delivered
6 days
Typical slab cycle
6,400+
Units completed
Talk to us about a high-rise residential project

Selected projects

Buildings you can go and stand in.

Six of the last 340. Every one delivered under a main contract with our own supervision on site.

Marasi HeightsResidential01 / 06

Marasi Heights

Business Bay, Dubai

48-floor residential tower, 512 apartments, three basement levels.

AED 640mHandover 2025
Jebel Ali Logistics ParkIndustrial02 / 06

Jebel Ali Logistics Park

Jebel Ali Free Zone

96,000 m² temperature-controlled distribution centre and gatehouse.

AED 310mHandover 2024
Verde Specialist HospitalHealthcare03 / 06

Verde Specialist Hospital

Al Barsha, Dubai

220-bed hospital, eight theatres, imaging block and helipad.

AED 470mHandover 2024
Dune Ridge ResortHospitality04 / 06

Dune Ridge Resort

Al Qudra, Dubai

180-key desert resort, 14 villas, spa and beach club fit-out.

AED 520mHandover 2023
Qasr Retail PavilionRetail05 / 06

Qasr Retail Pavilion

Dubai Hills

Two-level retail pavilion, 62 tenant units, structural glass roof.

AED 240mHandover 2023
Northline InterchangeInfrastructure06 / 06

Northline Interchange

Dubai Investments Park

Interchange upgrade and 3.4 km of utility diversions, RTA standard.

AED 180mHandover 2022
Your project could be number 341.
Marasi Heights under construction

Case study · Business Bay, Dubai

Marasi Heights, five weeks early.

Handed over five weeks early on a site with four metres of ground water and one access road shared with two live towers.

Floors
48
Apartments
512
Programme
34 months
Peak workforce
1,240
Concrete poured
78,000 m³
Rating
Al Safat Gold
They ran the interface with the two neighbouring towers themselves. We never once had to arbitrate access.
Development Director · Marasi Developments

How we build

From tender to defects, on one register.

You will know which stage the job is in, who owns it, and what is due next — every week, without asking.

  1. 01

    Tender and pre-construction

    3–6 weeks

    A priced bill, a buildability review and every risk we can see from day one, written down before anyone signs.

  2. 02

    BIM coordination

    4–8 weeks

    Structure, MEP and facade clash-detected to LOD 350, so the model is the drawing set the site actually builds from.

  3. 03

    Authority approvals

    In parallel

    Municipality, Trakhees, DDA, Civil Defence and DEWA submissions tracked on one register with named owners.

  4. 04

    Mobilisation

    2 weeks

    Site establishment, tower cranes, hoardings and an induction every worker passes before they reach the deck.

  5. 05

    Execution

    Programme

    A weekly look-ahead, a fortnightly client walk, and a cost report that arrives on the same date every month.

  6. 06

    Handover and DLP

    12 months

    Commissioning evidence, O&M manuals and as-builts on day one, then a defects team you can call directly.

Steel fixers working a column cage

Health, safety and welfare

Nobody goes home injured. That is the only version of finished we accept.

0.28
LTIFR, 12-month rolling average
9.8m
Man-hours worked without a fatality
4,200
Toolbox talks delivered last year
312
Supervisors holding NEBOSH or IOSH
  • Every worker inducted in a language they speak, and tested before they reach the deck.
  • Midday break enforced from 12:30 to 15:00, June through September.
  • Chilled water, shaded rest areas and welfare inspected weekly on every site.
  • Independent HSE audit each quarter, with findings published to the client.

Certified to

  • ISO 9001:2015
  • ISO 14001:2015
  • ISO 45001:2018
  • DM Contractor Grade 1
  • Trakhees registered

Audit reports and method statements are available on request during tender, not after award.

Clients and consultants

Twenty-two months, four variations, and not one claim at the end of it. That is rare in this market.

Project Director · Northline Industrial

Request a quote

Send us the drawings. We will send back a number.

Concept sketches are enough to start. If you have a tender pack, even better — attach it in the reply to our acknowledgement.

  • A priced, itemised submission — not a range in an email.
  • Back to you within five working days of the enquiry.
  • Reviewed by the estimator and the contracts manager who would run it.

Or call the tender desk

+971 4 512 8800tenders@ironline.ae
Scope

Demo form — nothing is sent anywhere. Contracting LLC, Bay Square 11, Business Bay, Dubai.